The 2011 accident

The Fukushima Daiichi Nuclear Power Station, operated by Tokyo Electric Power Company (TEPCO) in Fukushima Prefecture, was hit on March 11, 2011, by the Tohoku earthquake and the tsunami that followed. The earthquake cut off the plant's outside power supply, and the tsunami flooded its emergency power equipment, causing a station blackout in which the reactors lost their cooling. The cores of Units 1 to 3 melted, and hydrogen explosions damaged reactor buildings. The accident was provisionally rated Level 7, the most serious level on the International Nuclear and Radiological Event Scale (INES).

The area within 20 kilometers of the plant was made a restricted zone, areas beyond it were designated for evacuation, and about 150,000 people were forced to leave their homes.

Decommissioning

Decommissioning follows a mid-to-long-term roadmap, last revised in December 2019, under which TEPCO carries out the work with the involvement of the national government. The government gives 2041 to 2051 as the target for completing it, that is, 30 to 40 years after the accident. The main tasks are removing spent fuel from the storage pools, retrieving the melted fuel debris, and dealing with contaminated and treated water. Trial retrieval of fuel debris began in September 2024, and small amounts were retrieved in November 2024 and April 2025.

ALPS treated water

Water at the site is run through ALPS, the Advanced Liquid Processing System, which removes radioactive substances other than tritium until they fall below regulatory standards. Tritium, a radioactive form of hydrogen, behaves chemically like ordinary hydrogen and is very hard to separate from water. According to the Ministry of Foreign Affairs, its radiation is weak enough to be blocked by a sheet of paper, and it does not build up in the body but leaves with water. Before release, the treated water is diluted more than 100 times with seawater, bringing tritium to about 1,500 becquerels per liter, less than one-fortieth of the national standard of 60,000, and other substances to less than one-hundredth of their standards.

Release into the sea began on August 24, 2023. By September 18, 2026, 23 rounds of discharge totaling about 180,600 cubic meters had been completed. In a comprehensive report, the International Atomic Energy Agency (IAEA) found the approach consistent with international safety standards and concluded that its radiological impact on people and the environment would be negligible. The IAEA has continued to send review missions since the release began.

Reaction abroad

The release has also been a diplomatic issue. China imposed restrictions on imports of Japanese seafood in 2023 after the release began, and lifted them in early November 2025. Later that month, amid a diplomatic dispute over remarks on Taiwan by Prime Minister Sanae Takaichi, Japanese media reported that China had told Japan it would suspend imports again, citing the need for further monitoring of the treated water.