The bullet train
The shinkansen (新幹線, "new trunk line") is Japan's network of high-speed railways, often called the bullet train in English. The first line, the Tōkaidō Shinkansen between Tokyo and Shin-Osaka, opened on October 1, 1964, just before the Tokyo Olympics. Its fastest trains then took four hours, with a top speed of 210 km/h. Today they run at up to 285 km/h, as many as 12 Nozomi trains an hour can run in each direction, and on busy days more than 480 trains use the line.
Safety is central to its reputation. The transport ministry says no passenger has died in a shinkansen train accident since the line opened in 1964.

A growing network
In 1973 the government drew up plans for five more lines, known as the seibi shinkansen: the Hokkaido line to Sapporo, the Tōhoku line from Morioka to Aomori, the Hokuriku line from Tokyo to Osaka, and two Kyushu lines, to Kagoshima and to Nagasaki. The first section opened in October 1997, and the Hokuriku Shinkansen reached Tsuruga in Fukui Prefecture in March 2024.
Gaps remain. The Hokkaido extension to Sapporo is now expected to open around the end of fiscal 2038, construction of the Tsuruga to Shin-Osaka section has not started, and no plan has been agreed for the unbuilt part of the line to Nagasaki. When a new section opens, the parallel conventional line is usually separated from the JR company that runs the shinkansen, and local governments often have to keep it running.
The maglev
JR Central is also building the Chūō Shinkansen, a magnetic levitation line that will link Shinagawa in Tokyo with Nagoya. Work in Shizuoka Prefecture was held up for years before the governor accepted construction in July 2026, and the cost estimate, raised to 11 trillion yen in 2025, is under review again. In November 2026 JR Central said it would not announce an opening date until after the new year. Kyodo News reports that the Shinagawa to Nagoya section will open in 2037 or later.
Reading shinkansen in the news
Shinkansen news often covers delays caused by snow or heavy rain, new train models and fares. In regional news, a new line is a long-awaited project that is expected to bring tourists and business, while questions about its cost and about the future of the old local line follow close behind.
Sources
- Ministry of Land, Infrastructure, Transport and Tourism: Shinkansen railways (in Japanese; the five planned lines and parallel conventional lines)
- Ministry of Land, Infrastructure, Transport and Tourism: White Paper on Land, Infrastructure, Transport and Tourism 2025, trunk railway network (in Japanese; safety record, the 2024 Tsuruga opening and the Sapporo timetable)
- Excite News (Tetsudo Channel): How much faster has the shinkansen become in 60 years? (in Japanese; speeds and train numbers on the Tōkaidō line)
- Kumamoto Nichinichi Shimbun (Kyodo News): JR Central president postpones announcing the maglev opening date until after the new year (in Japanese; November 2026)
- Kanaloco (Kyodo News): Maglev construction costs to rise again (in Japanese; the 11 trillion yen estimate and the Shizuoka section)