Tokyo to Nagoya in 40 minutes
The Chuo Shinkansen (Chūō Shinkansen, 中央新幹線) is a planned railway between Tokyo and Osaka, built and to be run by Central Japan Railway Company (JR Central), one of the JR group companies. Instead of steel wheels on rails, its trains float and are driven by superconducting magnets, a system called superconducting maglev (chōdendō rinia, 超電導リニア). The maximum design speed is 505 km/h.
The first stage runs 286 km from Shinagawa in Tokyo to Nagoya, with a fastest planned journey of 40 minutes. One intermediate station is planned in each of Kanagawa, Yamanashi, Nagano and Gifu prefectures. The full 438 km route to Osaka would take 67 minutes. The line passes under the Southern Alps (Akaishi Mountains).
From 1962 research to an approved plan
Research on superconducting maglev began in 1962 at the research institute of Japanese National Railways. The line was placed in the basic plan under the Nationwide Shinkansen Railway Development Act in 1973. In May 2011, the transport minister named JR Central as builder and operator and decided the line's development plan. After an environmental impact assessment, the ministry approved the construction plan for Shinagawa to Nagoya in October 2014.
The technology has been tested on the Yamanashi Maglev Line since 1997. The test line was extended to 42.8 km in 2013, and in April 2015 a manned Series L0 train reached 603 km/h there. Guinness World Records recognized it as the fastest maglev train.

A 2027 target that slipped
The original plan was to open Shinagawa to Nagoya in 2027 and reach Osaka in 2045. In 2016, the government decided to lend money through the Fiscal Investment and Loan Program so that work toward Osaka could follow without a pause, bringing the full opening forward by up to eight years.
In October 2025, JR Central said it could not forecast an opening date because tunnel excavation in the Shizuoka section had not yet started, and that it would announce one when it could. The ministry's summary lists JR Central's expected opening as "2027 or later".
The cost estimate for Shinagawa to Nagoya has also grown, from 5.52 trillion yen to 7.04 trillion yen in 2021 and 11.0 trillion yen in October 2025, including trains. JR Central cited rising prices and difficult construction work.
The Shizuoka section
The tunnel crosses northern Shizuoka Prefecture under the Southern Alps and the upper reaches of the Oi River (Ōigawa, 大井川), and the line has no station in Shizuoka. The prefectural government says it supports the project, but that the tunnel work raised concerns, centered on the river's water resources and the natural environment of the Southern Alps. The ministry convened an expert panel to review both sides' arguments scientifically, then a monitoring meeting to check the measures.
In July 2026, the prefecture and JR Central signed a nature conservation agreement for the construction under a prefectural ordinance. The prefecture presented it together with terms on how JR Central will respond if water use along the Oi River is affected, and a monitoring system for after work starts.
Reading the Chuo Shinkansen in the news
In Japanese, the project is usually called Rinia Chūō Shinkansen (リニア中央新幹線), and headlines may shorten it to rinia. The word comes from "linear motor car" (rinia mōtā kā), the Japanese term for trains driven by a linear motor. In English it may be translated as "maglev", "Chuo Shinkansen" or "Linear Chuo Shinkansen".
Despite the name, the line is not an extension of the existing shinkansen network. It is a separate line with a different technology, planned under the same national law. JR Central already links the same cities by the Tokaido Shinkansen on another route. The ministry expects that once the maglev reaches Osaka, through passengers will shift to it, freeing capacity on the Tokaido line.
"2027" in older reports is the original target, not the current schedule. For costs, check the date and whether a figure covers Shinagawa to Nagoya or the whole line.
Sources
- Ministry of Land, Infrastructure, Transport and Tourism: About the Linear Chuo Shinkansen (in Japanese; planning history, original opening targets, Shizuoka expert panel and monitoring meeting)
- Ministry of Land, Infrastructure, Transport and Tourism: Outline of the Linear Chuo Shinkansen (in Japanese; distances, journey times, stations and expected opening year)
- Central Japan Railway Company: Notice on the total construction cost of the Chuo Shinkansen between Shinagawa and Nagoya (in Japanese; October 29, 2025)
- Central Japan Railway Company: History of superconducting maglev development (in Japanese; Yamanashi test line and the 603 km/h record)
- Shizuoka Prefecture: Response to the environmental effects of the Linear Chuo Shinkansen construction (in Japanese; updated July 30, 2026)